World wide brand since 1978
World wide brand since 1978
Warranty terms up-to 60 years
Approved international technologies
Individual project and raw material design
Visual effect and approving results
Increasing value and lifecycle of your property
Ecologically neutral materials
GeoResin services by sectors and types
Other objects

DEEP Lifting TECHNOLOGY:

Stabilization of foundations with a possible rise. By introducing an expanding geopolymer under the foundation of a structure or building. Elimination of cracks, skew and roll of buildings.
More about Deep Lifting

ALL GeoResin WORK IN PROGRESS:

  • No earthwork
  • Without stopping the work of the enterprise
  • No need to vacate the room
  • On the local floor
  • Quickly, silently, without waste and garbage
  • Стандарт РФ и ЕС

Stages of restoration work

  1. Inspection, documentation, budgeting, timing. Initial inspection of the facility and specialist advice is free of charge.
  2. Drilling holes 12-16 mm and pumping through them the polymer composition GeoResin into the thickness of the soil under the foundation or floor slab. At the local site.
  3. Expanding, the composition of GeoResin fills the voids, compacts and stabilizes the soil. The average project is from 8 hours to two days.
  4. Checking the quality of eliminating problems on the site using laser measuring equipment. Accuracy up to 0.5 mm, 5 year warranty.

Floor Lifting TECHNOLOGY:

Stabilization of foundations with a possible rise. By introducing an expanding geopolymer under the foundation of a structure or building. Elimination of cracks, skew and roll of buildings.:
Learn more about Floor Lifting
Completed projects

In a residential building, a floor slab sank after a pipe burst

Reinforcement of base soils and re-leveling of floor slab

Technological excessive subsidence of a building columns

Stopping subsidence and increasing the load-bearing capacity of the pile foundation

Eroding the foundation of the supporting columns

Strengthening the foundation foundation without disrupting the entire project schedule

Weak watered soils and unsuccessful attempt to stabilize

Reinforcement of soils at the base of slab foundations

Cracks on load-bearing walls, incl. on window and doorways

Reinforcement of foundation soils, filling of voids

Cracks on the inner sides of the walls of the basement room

Strengthening and consolidation of soils of the base of foundations

Local floor subsidence

Reinforcement of base soils and leveling of the floor slab

Internal load-bearing columns have undergone settlement

Stopping uneven settlement of column foundations

Tank bottom subsidence

Reinforcement and leveling of the steel bottom

Deformations and cracks of supporting structures

Reinforcement of soils of foundations

Erection of a new curtain wall on the existing foundation

Strengthening and sloughing of soils of the base of the foundation

Draft of the structure with non-standard heel

Aligning the tank structure

Strengthening the foundation soil and stabilizing the foundation

Strengthening the foundation soil and stabilizing the foundation

Draft of one of the corners of the building

Raising and leveling the foundation slab in the horizon

Ragged horizontal cracks began to appear and develop

Reinforcement of foundation soils and filling of voids

Have a question?
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

Choose a convenient time to call

Leave your email and we will send you this article

Get a free assessment of the construction and installation solution
  • Services
  • GeoResin methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    GeoResin