en
ru

We work throughout Russia

Uretek

Elimination of cracks in foundations and supporting structures

Cracks - the headache of any manager or service operator

Technologies that ensure the elimination of cracks in the foundation and walls of office and business centres without excavation and the need to stop the work of the business center and the shopping center. A process that does not disrupt the natural rhythm of work and existing communications. As fast as possible, economically and reliably.

Wall cracks in commercial and industrial buildings

               GeoResin's restoration methods allow you to lift buildings of almost any size. Great practice in numerous projects has caused the success of technology around the world. The solutions to correct the consequences of subsidence of foundations that we provide to the commercial and industrial sector are in demand for many reasons. An important factor is how efficient the processes are in terms of time and cost. Buildings that  "leveled" are not suffer from cracks in the walls. They can form inside and outside. But as the building returns to its design level, these cracks usually close up, leaving only a small patch, and require final processing. Most importantly, structural damage is reparable so there is a future for the building.

How to fix large cracks in the walls

               The best long-term solution for fixing and subsequent filling of cracks is lifting with re-alignment (so that the cracks close) or stabilization of the base and then filling the cracks in the next step. This crack correction process is called reinforcement. As the building is leveled, cracks in the walls can be closed or reduced, ready for plaster or other finishing process. Windows and doors again, as a rule, begin to work properly. Traditional methods of strengthening the foundation or leveling include total excavating or excavating parts of the foundation, pouring concrete (or cement milk), waiting for it to cure (which is not always possible to track), and then lifting the building from concrete blocks with jacks (if it is possible). In any case, the traditional method does not guarantee the result and can be time-consuming and not reliable (often requiring weeks or months) and necessarily dirty. This usually means that you will have to free part or all of the building while the professionals are working.

               

Show more ⬇
Discuss your particular case with a specialist and ask the questions that concern you the most, to which you did not find answers

The formation of cracks in the foundation and walls is provoked by the following factors:
More?

Questions answered by GeoResin:
More?

Specialization in bases and foundations
Imported technologies and equipment
More than 10 years of successful injection practice in Russia
Admission to particularly dangerous, technically complex and unique objects
Heavy polymers of own specification
Warranty on the position of structures in space after work
The development of Finnish injection technologies since 1978
The technology standard was developed at the Research Institute. Gersevanova
25%

Efficiency and effectiveness

5years

Extended minimum warranty terms

2-3
days

Fantastic productivity and speed

18sec

Quick material curing time

0,5mm

Accuracy at every stage of works

Completed projects
210
YOU CAN CONTACT Georesin:
Understand what is happening
Make an informed and informed decision
Take control of an asset
Increase facility life
Stop Lost Asset Value
Choose the most suitable way to implement the solution
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

How can I call you?
Your phone:
Choose a convenient time to call:

Leave your email and we will send you this document

Get a free assessment of the construction and installation solution