Business centre "Moscow-city": the object site is a section of the drainage system with asphalt concrete coating, the area of work: S=250 m2.
In July 2015, work was carried out to strengthen the foundation soil down to a depth of – 5.5 m from the surface of the asphalt pavement, in order to prevent the development of further deformations and subsidence of the asphalt pavement.
The work was completed within 6 calendar days without stopping the on-going construction works. All signs of GeoResin work were eliminated afterwards.
Technological excessive subsidence of a building columns
Stopping subsidence and increasing the load-bearing capacity of the pile foundation
In a residential building, a floor slab sank after a pipe burst
Reinforcement of base soils and re-leveling of floor slab
Leakage of the retaining wall of the entrance to the underground garage
Compaction of soils and plugging of leaks in the retaining wall structure
Eroding the foundation of the supporting columns
Strengthening the foundation foundation without disrupting the entire project schedule
Reinforcement of foundation soils and stabilization of the foundation
Reinforcement of foundation soils and stabilization of the foundation
Strengthening the foundation soil and stabilizing the foundation
Strengthening the foundation soil and stabilizing the foundation
Subsidence of the slab and the appearance of a longitudinal crack
Compaction of the soil with filling the gap under the slab