Business centre "Moscow-city": the object site is a section of the drainage system with asphalt concrete coating, the area of work: S=250 m2.
In July 2015, work was carried out to strengthen the foundation soil down to a depth of – 5.5 m from the surface of the asphalt pavement, in order to prevent the development of further deformations and subsidence of the asphalt pavement.
The work was completed within 6 calendar days without stopping the on-going construction works. All signs of GeoResin work were eliminated afterwards.