Top.Mail.Ru
en
ru

We work throughout Russia

Uretek

IKEA warehouses

STRENGTHENING OF FOUNDATION SOILS
Category
Floor slabs at logistics centres
Object
Regional warehouse LLC " IKEA MOS»
Focus
Re-leveling floors and improving the soils
Location
Moscow region
Time of work
2017 г.
The timing
40 days
TECHNOLOGY
DEEP Lifting & Floor LIFTING

Description:

In April 2017, work was carried out to strengthen the foundation soil using GeoResin DEEP Lifting. The concrete floors were lifted up to 8 cm at maximum by Floor LIFTING injection.

The area of the work area is 10,000 m2. Work on strengthening the foundation soil and lifting the floor slabs was carried out during 40 days without stopping the logistics processes at the warehouse.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Leave a comment
Comments
Completed projects
230
  • Services
  • GeoResin methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this document

    Get a free assessment of the construction and installation solution