Top.Mail.Ru
en
ru

We work throughout Russia

Uretek

Strengthening pathways under Kratzer-crane

STRENGTHENING OF FOUNDATION SOILS
Category
Industrial machinery
Object
Stacker-reclaimer crane paths
Focus
Salted soils near the lake
Location
Astrahan region
Time of work
2016 г.
The timing
45 days
TECHNOLOGY
DEEP Lifting & Floor LIFTING

In the summer of 2016, project was carried out to strengthen the foundation soil using GeoResin technology by injection geopolymer resins. Deep Lifting technology was used firstly and after for re-leveling the crane railways the Floor LIFTING method was implemented. Work site was abot - 1 100 m^2.

Due to the high temperature in the daytime (up to 65 Celsius degrees), the work was carried out at night. The result of the work was precise re-leveling the crane railsways along the entire route of the Kratzer crane with error about ±5 mm between the neighbour rails.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Leave a comment
Comments
Completed projects
236
  • Services
  • GeoResin methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article

    Get a free assessment of the construction and installation solution