Top.Mail.Ru
en
ru

We work throughout Russia

Uretek

Stabilization of load-bearing structures of an administrative building in case of excessive uneven subsidence

Soil base subsidence and deformation of load-bearing structures
Category
Administrative and public buildings
Object
Part of an administrative building adjacent to other buildings
Focus
Elimination of foundation subsidence and stabilization of structures
Location
Ufa, Bashkortostan
Time of work
2017 г.
The timing
6 days
TECHNOLOGY
DEEP Lifting

Task:

Rapid elimination of the consequences of deformations of aboveground structures in the administrative building with excessive uneven subsidence of foundations by strengthening the soil base.

Input data:

Previously performed surveys of this and adjacent objects revealed the presence of different granular composition in the base of sandy soils with suffusion softening of individual layers due to water flows. Previous labor-intensive and costly measures in the form of strengthening the base by pouring concrete did not give the desired result.

Goal:

Ensuring normal operating conditions in the administrative building due to repair work, including strengthening the soil at the base of the foundations in an effective way.

Applied technologies:

The solution to the problem was provided by an effective method by GeoResin Deep Lifting technology, which provides the injection of a polymer composition into the soil at different depths, which quickly hardens and, when expanded, compresses the soil at this pressure and even raises the settled foundations with aboveground structures. In total, the polymer mixture was injected at 181 points at different levels under the soles of the foundations of internal and external load-bearing walls.

Result:

The quality of soil hardening and the lifting of sunken foundations with wall structures by an average of 0.5 mm was verified by dynamic soil sounding before and after the soil hardening. During the work, the process was monitored using laser monitoring equipment. As a result of the project implementation, the effectiveness of the measures taken by a third-party independent organization was confirmed. The work lasted for 6 working days.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Leave a comment
Comments
Completed projects
301
  • Services
  • GeoResin methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article

    Get a free assessment of the construction and installation solution