Top.Mail.Ru
en
ru

We work throughout Russia

Uretek

Stabilization and re-leveling of industrial floors at JSC "AD Plastik"

THE RESTORATION OF THE BEARING CAPACITY
Category
Industrial premises
Object
Production workshop
Focus
Concrete floor slabs
Location
Kaluga, Russia
Time of work
2014 г.
The timing
8 days
TECHNOLOGY
Floor LIFTING

AD Plastik CJSC is an international company for the production of plastic parts for subsequent installation on cars.

In 2014, new equipment with a total weight of 86 tons was installed in one of the production workshops of AD Plastik, after which there were deformations of the concrete floor plate.

With the help of GeoResin technology, works were performed to strengthen the bearing capacity of soils down to a depth of -3.5 m (from the surface of the floor plate), as well as to restore the bearing capacity of the floor slab in places of deformation.

All the works were cut without stopping production of AD Plastik CJSC. The work completion period was 8 calendar days. ground Engineering LLC provided a guarantee to AD Plastik CJSC for a period of 60 months.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Leave a comment
Comments
Completed projects
238
  • Services
  • GeoResin methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article

    Get a free assessment of the construction and installation solution