GeoResin's ground improvement and subsidence elimination technologies are based on the expansive power of multicomponent geopolymer mixtures. Based on our experience in lifting, re-levelling and restoring load-bearing structures, as well as fixing problems with the foundation soil, combined with our knowledge of unique local conditions, the company can guarantee a successful solution even in the most neglected cases.
Re-leveling and support of industrial buildings, floors, and driveways
Factory and warehouse buildings, floors (slabs) and driveways may collapse due to loss of bearing capacity of the foundation soil. Most settling problems can be resolved quickly and cost-effectively by injecting expanding resin with no interference with your work. The process, often referred to as Floor lifting, is quick and clean: no excavation, no water and other materials, no cement dust, no mess: unlike the concrete approach. You don't have to wait a few days for the new cement to dry and set. Your forklifts, pallet trucks, and trucks can operate in the work area just 30 minutes after the GeoResin upload is complete. Moving and sagging slabs or foundations can be re-strengthened, re-leveled, and preserved, unless they have completely collapsed. In a difficult situation, our experienced technical specialists can advise you what can be saved and what needs to be replaced.
Resin injections to improve the deeper ground and strengthen the foundation
In the past, GeoResin only used the deep Lifting process, where resins were injected through long tubes to various depths in the ground. For more than 5 years, the company has been using resins and technologies for compacting and strengthening the soil. Based on this experience, we have developed and improved technology in the form of "column" injection to improve the condition of the ground and re-level structures and buildings as a whole. Under certain ground conditions, the load-bearing capacity can be increased up to 500% in this way.
Our proprietary GeoResin reinforcement and lifting process can help to mitigate the effects of decompression by creating a geomass base or polymer-bearing columns "stretched" to a conventional continent. The pressure of the expanding resin compresses and compacts the surrounding soil and "jams" into it until it can no longer resist the counter force.Lifting slabs and foundations sometimes requires a combination of different technologies, which proves once again the flexibility and breadth of possibilities for a convenient and effective solution.
In a residential building, a floor slab sank after a pipe burst
Reinforcement of base soils and re-leveling of floor slab
Technological excessive subsidence of a building columns
Stopping subsidence and increasing the load-bearing capacity of the pile foundation
Eroding the foundation of the supporting columns
Strengthening the foundation foundation without disrupting the entire project schedule
Weak watered soils and unsuccessful attempt to stabilize
Reinforcement of soils at the base of slab foundations
Cracks on load-bearing walls, incl. on window and doorways
Reinforcement of foundation soils, filling of voids
Cracks on the inner sides of the walls of the basement room
Strengthening and consolidation of soils of the base of foundations
Local floor subsidence
Reinforcement of base soils and leveling of the floor slab
Internal load-bearing columns have undergone settlement
Stopping uneven settlement of column foundations
Tank bottom subsidence
Reinforcement and leveling of the steel bottom
Deformations and cracks of supporting structures
Reinforcement of soils of foundations
Erection of a new curtain wall on the existing foundation
Strengthening and sloughing of soils of the base of the foundation
Draft of the structure with non-standard heel
Aligning the tank structure
Strengthening the foundation soil and stabilizing the foundation
Strengthening the foundation soil and stabilizing the foundation
Draft of one of the corners of the building
Raising and leveling the foundation slab in the horizon
Ragged horizontal cracks began to appear and develop
Reinforcement of foundation soils and filling of voids
Erosion under the floor and foundations
Stabilizing piles and leveling the foundation slab
The back of the house began to sag. Cracks appeared on the walls and ceiling
Strengthening and lifting load-bearing structures quickly and safely
Re-leveling of industrial structures
Alignment in the plane of structures of foundations and equipment
Insufficient bearing capacity of base soils
Reinforcement of base soils and leveling of the floor slab
Washing out some of the soil and damage to floor slabs
Reinforcement and local leveling of floor slabs
Uneven settlement of a building after a pipe break
Strengthening the soils of the base of the strip foundation
Negative effects of dynamic loads on foundations and floor slabs
Reinforcement of foundation soils and leveling of foundations and floors
The room sagged due to a weak soil base
Strengthening the base and leveling sagging structures
Reinforcement of foundation soils and stabilization of the foundation
Reinforcement of foundation soils and stabilization of the foundation
Cracks in the walls with development in time
Reinforcement of foundation soils and lifting of structures
Cracks in load-bearing walls
Repair and restoration work with soil and bearing structures
Some of the column foundations have undergone uneven settlement
Stopping uneven settlement of column foundations
The method of reinforcement proposed by the prescription did not suit the customer
Strengthening the base and vertical lifting of sagging structures
Lack of bearing capacity of the base
Securing soils under floors in places where racks are installed
Progressive uneven settlement of the foundation with a heel
Strengthening the foundation soil and leveling the building
Soil leaching and significant settlement of floors and foundations
Reinforcement of soils of the base of foundations, lifting and leveling the floor slab
A void has formed under the foundation slab
Reconstruction of the foundation slab support
Uneven settlement of the floor slab and the foundation of the landing stage
Leveling the floor slab and lifting sagging foundation elements
Deformations of barbecue area structures
Filling and leveling the foundation
Uneven settlement of load-bearing columns
Stopping sedimentary processes
Uneven settlement of foundations with deformations
Reinforcement of the foundation soils, recommendations for drainage are given
Drawdown of road maps of the ring road
Aligning the plane of the road while maintaining the "slope"
Local subsidence of the floor of the room
Reinforcement of base soils and leveling of the floor slab
Uneven draft on average 45 mm
Compaction of the base and return of structures to their previous level
Building roll problem
Reinforcement of the base and alignment of the roll
A void has formed under the foundation slab
Recreating the support of the foundation slab on the base
Sagging corner of the house and a crack along the body of the foundation
Deformation stabilization
Excessive uneven settlement of foundations
Reinforcement of the foundation and lifting of settled foundations
Insufficient bearing capacity of watered base soils
Increasing the bearing capacity of the base and foundations
Deflection of the floor slab and the appearance of cracks on load-bearing walls
Reinforcement, filling and leveling of floor slabs
Defects in overhead structures from frost heaving in soils
Strengthening the base soils with the elimination of heaving properties
Uneven house draft during renovation
Providing support for foundations with alignment of structures
Cracks in load-bearing walls both inside and outside the house
The load-bearing structures have been reinforced and raised to a predetermined level
Deformation of crane runways of the Crane-Stacker
Alignment of crane rails
Unstable foundation and settlement of load-bearing structures
Stopping the processes of settling foundations
The foundation has settled with deformations reflected on the floor slabs
Stopping the processes of settling foundations and leveling the working surface of the floor slabs
Uneven settlement of foundations with cracking
Soil hardening at the base of foundations
Subsidence of the slab and the appearance of a longitudinal crack
Compaction of the soil with filling the gap under the slab
Leakage of the retaining wall of the entrance to the underground garage
Compaction of soils and plugging of leaks in the retaining wall structure
Instability of floor slabs and local subsidence
Stabilization of base soils and leveling of floor slabs
Deformations and settlements of asphalt concrete pavement
Reinforcement of foundation soils to a depth of - 5.5m
Uneven settling of the floor slab
Stabilization and lifting of reinforced concrete floor slabs
Floor subsidence occurred inside the warehouse
Restoration of the design levels of the floor and shelving in the premises
Deformations in the masonry at the outer wall section
Strengthening the soil at the base of the foundation with its rise
Deformation of reinforced concrete floor slabs under new equipment
Restoration of the bearing capacity of reinforced concrete floor slabs in places of deformation
Deformations in supporting structures
Soil stabilization of foundations
Uneven subsidence of the floor and the formation of voids under it
Restoration of the design level of the floor
Sagging corner and crack in the outer cladding
Consolidation and strengthening of soil at the base of foundations
Efficiency and effectiveness
Extended minimum warranty terms
Fantastic productivity and speed
Quick material curing time
Accuracy at every stage of works